Cedar Valley Middle School - Bond 2018
Individual capital renewal and replacement project details can be found on the Bond 2018 project definition sheets.
Campus Projects
- Flooring replacement
- Replace domestic boiler
- Replace gym bleachers
- Replace insulation on chill water lines
- Upgrade door hardware, keys, and locks as needed
- Irrigation controls
- Ceiling improvements
- Power factor correction
- Computer Refresh – Student Laptop Cart Devices
- Computer Refresh – CTE/Journalism
- Projector Refresh
- Cafeteria AV/Multimedia System Refresh
- Server/Storage Refresh
- Local Area Network (LAN)/Wide Area Network (WAN) Refresh
- UPS Refresh
- Technology Requests for Fine Arts
- WAN Fiber Refresh
- Virtual Desktop Infrastructure Refresh/Expansion
- Wireless Refresh
- Access Control System
- Bus/Fleet Management System
- Campus Radios and Signal Repeaters
- Emergency Notification System
- Emergency Telephone/Intercom
- Intrusion Detection/Burglar Alarm System
- Portables Surveillance Cameras and Panic Buttons
- Staff and Student Badging System
- Two-Way Communication System
- Video Surveillance System
- Visitor Management System
Project costs are available for review on the Bond 2018 Project List
Feeder pattern projects
Cedar Valley Middle School feeds into McNeil and Round Rock high schools.