Sommer Elementary - Bond 2018

Individual capital renewal and replacement project details, including playground breakdowns, can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Playground improvements
  • Replacement of folding wall between cafeteria and gym
  • Irrigation controls
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – Campus and Staff Devices
  • Classroom Interactive Flat Panels (Replace when existing projectors reach end of life)
  • Cafeteria AV/Multimedia System Refresh
  • Server/Storage Refresh
  • Local Area Network (LAN)/Wide Area Network (WAN) Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • WAN Fiber Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

Feeder pattern projects

Sommer Elementary feeds into Cedar Valley and Pearson Ranch middle schools and McNeil and Round Rock high schools.

QUESTIONS ABOUT SCHOOL BOND 2018?

Bond 2018 News