Bond Program 2024

Westwood High School

12400 Mellow Meadow Drive, Austin, TX 78750

Estimated Cost of Proposed Projects

$11,827,000

Proposed Projects

Roofing Improvements • Ceiling Improvements • Casework and Cabinet Improvements • Locker Room Improvements • Water Bottle Fillers • Parking Improvements

Replace Student Devices and Peripherals (Cases, Power Cables) • Replace Staff Devices and Peripherals • Upgrade Instructional Technology and Infrastructure • Replace Projectors and Printers • Upgrade IT Security, Including Content Filtering Devices and Software • Replace Time Clocks and Phone System Equipment • Replace Cafeteria Computers and Printers

""

Remote Modular Locker Room Near Fields • Girls Locker Room Improvements • Tennis Court Improvements • Track Improvements • Turf Installation at Baseball and Softball Fields

Black Box Theatre Improvements • Uniform Replacement

""

Fire Alarm Improvements • Security System Improvements

Facility Condition Index (FCI)

District Average High School: 7.0% | This Facility: 4.0%

Facility Condition Index is a measure of how much work/capital renewal a campus or facility needs.
The higher the percentage, the more work a facility needs.

>30%

Critical

10-30%

Poor

5-10%

Fair

0-5%

Good