Round Rock High School
201 Deep Wood Drive, Round Rock, TX 78681
Estimated Cost of Proposed Projects
$137,367,000
Proposed Projects
Campus Project Sheet
Demolition of Old Buildings • Construction of New Academic Building to Replace Old Buildings • Plumbing Improvements • Roofing Improvements • Overhead Door Upgrades • Exterior Wall Repairs • Ceiling Improvements • Wall Finish Improvements • Student/Staff Parking Improvements • Cafeteria Improvements • Water Bottle Fillers • Drainage Improvements
Replace Student Devices and Peripherals (Cases, Power Cables) • Replace Staff Devices and Peripherals • Upgrade Instructional Technology and Infrastructure • Replace Projectors and Printers • Upgrade IT Security, Including Content Filtering Devices and Software • Replace Time Clocks and Phone System Equipment • Replace Cafeteria Computers and Printers
Fire Alarm Improvements • Security System Improvements
Facility Condition Index (FCI)
District Average High School: 7.0% | This Facility: 9.2%
Facility Condition Index is a measure of how much work/capital renewal a campus or facility needs.
The higher the percentage, the more work a facility needs.
>30%
Critical
10-30%
Poor
5-10%
Fair
0-5%
Good