Early College High School
2400 Chandler Creek Blvd., Round Rock, TX 78665
Estimated Cost of Proposed Projects
$6,000,000
Proposed Projects
Completion of Permanent New Building to Replace Portables
Replace Student Devices and Peripherals (Cases, Power Cables) • Replace Staff Devices and Peripherals • Upgrade Instructional Technology and Infrastructure • Upgrade IT Security, Including Content Filtering Devices and Software
Facility Condition Index (FCI)
District Average High School: 7.0% | This Facility: N/A
Facility Condition Index is a measure of how much work/capital renewal a campus or facility needs.
The higher the percentage, the more work a facility needs.
>30%
Critical
10-30%
Poor
5-10%
Fair
0-5%
Good