McNeil High School
5720 McNeil Drive, Austin, TX 78729
Estimated Cost of Proposed Projects
$62,895,000
Proposed Projects
Renovate Maintenance Building for Campus Use • Roofing Improvements • Academic Renovation Phase 3A: Renovate A, B, C, & Upstairs G Wings, Visual Arts Space Upgrades, Locker Room Renovation, Field Storage Building Replacement & Expansion, Ceramics Lab, Weight Room Expansion, Training Room Expansion
Replace Student Devices and Peripherals (Cases, Power Cables) • Replace Staff Devices and Peripherals • Upgrade Instructional Technology and Infrastructure • Replace Projectors and Printers • Upgrade IT Security, Including Content Filtering Devices and Software • Replace Time Clocks and Phone System Equipment • Replace Cafeteria Computers and Printers
Conversion
Security System Improvements
Facility Condition Index (FCI)
District Average High School: 7.0% | This Facility: 14.3%
Facility Condition Index is a measure of how much work/capital renewal a campus or facility needs.
The higher the percentage, the more work a facility needs.
>30%
Critical
10-30%
Poor
5-10%
Fair
0-5%
Good