Bond Program 2024

Chisholm Trail Middle School

500 Oakridge Drive, Round Rock, TX 78681

Estimated Cost of Proposed Projects

$14,311,000

Vertical Learning Community

Round Rock High School – $137,367,000

Proposed Projects

Plumbing Improvements • Roofing Improvements • HVAC Replacement • Ceiling Improvements • Casework and Cabinet Improvements • Wall Finish Improvements • Floor Improvements • Cafeteria Improvements • Water Bottle Fillers • Drainage Improvements • Digital Marquee Installation

Replace Student Devices and Peripherals (Cases, Power Cables) • Replace Staff Devices and Peripherals • Upgrade Instructional Technology and Infrastructure • Replace Projectors and Printers • Upgrade IT Security, Including Content Filtering Devices and Software • Replace Time Clocks and Phone System Equipment • Replace Cafeteria Computers and Printers

""

Locker Room Improvements • Track Improvements • Turf Conversion

Stage Curtain Replacement • Visual Arts Improvements

""
Fire Prevention • Fire Alarm Improvements • PA System Replacement • Security System Improvements

Facility Condition Index (FCI)

District Average Middle School: 8.4% | This Facility: 9.1%

Facility Condition Index is a measure of how much work/capital renewal a campus or facility needs.
The higher the percentage, the more work a facility needs.

>30%

Critical

10-30%

Poor

5-10%

Fair

0-5%

Good