Round Rock High School - Bond 2018

Individual capital renewal and replacement project details can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Parking lot improvements
  • Irrigation controls
  • Interior lighting retrofit
  • Replace existing electrical panels
  • Replace existing main electrical switch gear
  • Drainage repair
  • Power factor correction
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – CTE/Journalism
  • Projector Refresh
  • Server/Storage Refresh
  • Local Area Network (LAN)/Wide Area Network (WAN) Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • Wireless Refresh
  • Virtual Desktop Infrastructure Refresh/Expansion
  • WAN Fiber Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Public Address (PA) System – AMX Replacement
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

QUESTIONS ABOUT SCHOOL BOND 2018?

Bond 2018 News