
Callison Elementary - Bond 2018
Individual capital renewal and replacement project details, including playground breakdowns, can be found on the Bond 2018 project definition sheets.
Campus Projects
- Replacement of folding wall between cafeteria and gym
- Playground improvements
- Irrigation controls
- Power factor correction
- Computer Refresh – Student Laptop Cart Devices
- Computer Refresh – Campus and Staff Devices
- Classroom Interactive Flat Panels (Replace when existing projectors reach end of life)
- Cafeteria AV/Multimedia System Refresh
- Server/Storage Refresh
- Local Area Network (LAN)/Wide Area Network (WAN) Refresh
- UPS Refresh
- Technology Requests for Fine Arts
- WAN Fiber Refresh
- Access Control System
- Bus/Fleet Management System
- Campus Radios and Signal Repeaters
- Emergency Notification System
- Emergency Telephone/Intercom
- Intrusion Detection/Burglar Alarm System
- Portables Surveillance Cameras and Panic Buttons
- Staff and Student Badging System
- Two-Way Communication System
- Video Surveillance System
- Visitor Management System

Feeder pattern projects
Callison Elementary feeds into CD Fulkes Middle School and Cedar Ridge High School.