Voigt Arts Integration Academy - Bond 2018

Individual capital renewal and replacement project details, including playground breakdowns, can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Upgrade door hardware, keys, and locks as needed
  • Playground improvements
  • Exterior lighting improvements
  • Replace existing electrical panels
  • Replace existing main electrical switch gear
  • Flooring replacement
  • Phase 1 renovation for restrooms, hallways and library
  • Roof replacement
  • Replace failing fire coiling doors and security gates
  • Replace fire alarm system
  • Remove/replace hallway wall covering
  • Ceiling improvements
  • Power factor correction
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – Campus and Staff Devices
  • Classroom Interactive Flat Panels (Replace when existing projectors reach end of life)
  • Cafeteria AV/Multimedia System Refresh
  • Server/Storage Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • WAN Fiber Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

Feeder pattern projects

Voigt Arts Integration Academy feeds into CD Fulkes Middle School and Cedar Ridge High School.