Round Rock High School - Bond 2018
Individual capital renewal and replacement project details can be found on the Bond 2018 project definition sheets.
Campus Projects
- Parking lot improvements
- Irrigation controls
- Interior lighting retrofit
- Replace existing electrical panels
- Replace existing main electrical switch gear
- Drainage repair
- Power factor correction
- Computer Refresh – Student Laptop Cart Devices
- Computer Refresh – CTE/Journalism
- Projector Refresh
- Server/Storage Refresh
- Local Area Network (LAN)/Wide Area Network (WAN) Refresh
- UPS Refresh
- Technology Requests for Fine Arts
- Wireless Refresh
- Virtual Desktop Infrastructure Refresh/Expansion
- WAN Fiber Refresh
- Access Control System
- Bus/Fleet Management System
- Campus Radios and Signal Repeaters
- Emergency Notification System
- Emergency Telephone/Intercom
- Intrusion Detection/Burglar Alarm System
- Portables Surveillance Cameras and Panic Buttons
- Public Address (PA) System – AMX Replacement
- Staff and Student Badging System
- Two-Way Communication System
- Video Surveillance System
- Visitor Management System
Project costs are available for review on the Bond 2018 Project List