Grisham Middle School - Bond 2018

Individual capital renewal and replacement project details can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Replace existing electrical panels
  • Irrigation controls
  • Construct Athletic Training Facility
  • Parking lot improvements
  • Upgrade door hardware, keys, and locks as needed
  • Irrigation controls
  • Ceiling improvements
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – CTE/Journalism
  • Projector Refresh
  • Cafeteria AV/Multimedia System Refresh
  • Server/Storage Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • Virtual Desktop Infrastructure Refresh/Expansion
  • WAN Fiber Refresh
  • Wireless Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Public Address (PA) System
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

Feeder pattern projects

Grisham Middle School feeds Westwood High School.

QUESTIONS ABOUT SCHOOL BOND 2018?

Bond 2018 News