Canyon Vista Middle School - Bond 2018

Individual capital renewal and replacement project details can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Flooring replacement
  • Relocation of irrigation controls
  • Replace pumps and controls to Lift Station
  • Redesign and upgrade main electrical room
  • Install HVAC to CTE lab
  • Renovate football concession, restrooms and storage
  • Upgrade door hardware, keys, and locks as needed
  • Irrigation controls
  • Replace failing fire coiling doors and security gates
  • Ceiling improvements
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – CTE/Journalism
  • Projector Refresh
  • Cafeteria AV/Multimedia System Refresh
  • Server/Storage Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • Virtual Desktop Infrastructure Refresh/Expansion
  • WAN Fiber Refresh
  • Wireless Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

Feeder pattern projects

Canyon Vista Middle School feeds into Westwood High School.

QUESTIONS ABOUT SCHOOL BOND 2018?

Bond 2018 News