Great Oaks Elementary - Bond 2018
Individual capital renewal and replacement project details, including playground breakdowns, can be found on the Bond 2018 project definition sheets.
Campus Projects
- Flooring replacement
- HVAC replacement and upgrade
- Roof replacement
- Upgrade door hardware, keys, and locks as needed
- Exterior lighting improvements
- Playground improvements
- Irrigation Controls
- Power factor correction
- Computer Refresh – Student Laptop Cart Devices
- Classroom Interactive Flat Panels (Replace when existing projectors reach end of life)
- Cafeteria AV/Multimedia System Refresh
- Server/Storage Refresh
- Local Area Network (LAN)/Wide Area Network (WAN) Refresh
- UPS Refresh
- Technology Requests for Fine Arts
- WAN Fiber Refresh
- Access Control System
- Bus/Fleet Management System
- Campus Radios and Signal Repeaters
- Emergency Notification System
- Emergency Telephone/Intercom
- Intrusion Detection/Burglar Alarm System
- Portables Surveillance Cameras and Panic Buttons
- Public Address (PA) System
- Staff and Student Badging System
- Two-Way Communication System
- Video Surveillance System
- Visitor Management System
Project costs are available for review on the Bond 2018 Project List
Feeder pattern projects
Great Oaks Elementary feeds into Cedar Valley Middle School and Round Rock High School.