Brushy Creek Elementary - Bond 2018

Individual capital renewal and replacement project details, including playground breakdowns, can be found on the Bond 2018 project definition sheets.

Campus Projects

  • Install single point control for lighting
  • Install fence at all-abilities playground
  • Sixteen classroom addition and expansion of the cafeteria and gym
  • Parking lot replaced
  • Upgrade door hardware, keys, and locks as needed
  • Exterior lighting improvements
  • Playground improvements
  • Irrigation controls
  • Ceiling improvements
  • Computer Refresh – Student Laptop Cart Devices
  • Computer Refresh – Campus and Staff Devices
  • Classroom Interactive Flat Panels (Replace when existing projectors reach end of life)
  • Cafeteria AV/Multimedia System Refresh
  • Server/Storage Refresh
  • UPS Refresh
  • Technology Requests for Fine Arts
  • WAN Fiber Refresh
  • Access Control System
  • Bus/Fleet Management System
  • Campus Radios and Signal Repeaters
  • Emergency Notification System
  • Emergency Telephone/Intercom
  • Intrusion Detection/Burglar Alarm System
  • Portables Surveillance Cameras and Panic Buttons
  • Staff and Student Badging System
  • Two-Way Communication System
  • Video Surveillance System
  • Visitor Management System

Project costs are available for review on the Bond 2018 Project List

Download Campus Project Sheet

Feeder pattern projects

Brushy Creek Elementary feeds into Cedar Valley Middle School and McNeil and Round Rock high schools.

QUESTIONS ABOUT SCHOOL BOND 2018?

Bond 2018 News