2014 Bond – Project Update by Campus

CAMPUS

PROJECT

BUDGET

SALE

COMPLETE

Anderson
Mill Elementary
Replace
all carpet in building

$261,565

1

Complete
Anderson
Mill Elementary
Install new fence at east side of campus

$79,773

3

Berkman Elementary Replace fire alarm system and expand fire alarm room

$350,000

1

Complete
Berkman Elementary Replace the sound system in the cafeteria

$32,311

1

Complete
Berkman Elementary Skylight replacement

$44,676

1

Complete
Blackland Prairie Elementary Replace classroom carpet in all but 10 classrooms

$71,038

2

Complete
Bluebonnet
Elementary
Add walk-in freezer/cooler and replace dishwasher

$304,832

1

Complete
Bluebonnet
Elementary
Expand nurse’s office and make ADA compliant

$132,022

3

Substantially Complete
Bluebonnet
Elementary
Replace HVAC

$745,000

1

Substantially  Complete

Brushy
Creek Elementary
Add irrigation system

$148,025

3

Caldwell
Heights Elementary
Replace
VCT in cafeteria and outside nearby restroom

$53,478

1

Complete
Caraway
Elementary
Replace existing PA/Clock/Bell systems

$269,326

1

Complete
Caraway
Elementary
Replace classroom carpet/VCT classrooms

$262,270

2

     Complete
Deep
Wood Elementary
Replace numerous HVAC units/upgrade electric

$389,618

1

Complete
Deep
Wood Elementary
Replace playground equipment (replacement parts no long
available)

$132,969

1

Complete
Deep
Wood Elementary
Reroof a portion of the existing roof

$726,613

1

Complete
Deep
Wood Elementary
Replace fire alarm system

$316,134

1

     Complete
Double
File Trail Elementary
Partial roof replacement

$193,219

1

Complete
Joe Lee Johnson ES Construction of new elementary

$36,741,113

1

    Complete
Fern
Bluff Elementary
Replace existing PA/Clock/Bell systems

$189,154

1

Complete
Fern
Bluff Elementary
Replace all carpet in building and cafeteria floor

$305,079

2

    Complete
Forest
North Elementary
Replace existing playground equipment (no ADA equipment)

$132,969

1

Complete
Forest
North Elementary
Replace fire alarm system

$316,135

1

Complete
Forest
North Elementary
Replace existing PA/Clock/Bell systems

$269,326

1

     Complete
Gattis Elementary Replace fire alarm system

$316,134

1

Complete
Great
Oaks Elementary
Replace fire alarm system

$316,134

1

Complete
Jollyville
Elementary
Replace existing PA/Clock/Bell systems

$269,326

1

    Complete
Jollyville
Elementary
Replace split systems and SEMCO units

$1,434,092

1

     Complete
Laurel
Mountain Elementary
Total library renovation

$405,902

3

     Complete
Live
Oak Elementary
Replace existing PA/Clock/Bell systems

$269,326

1

     Complete
Live
Oak Elementary
Replace Marvair/split systems/HVAC

$917,719

1

     Complete
Old
Town Elementary
Replace HVAC

$605,523

1

Substantially      Complete
Pond
Springs Elementary
Replace chillers/MUA/splits

$2,645,285

1

  Complete
Pond
Springs Elementary
Total library renovation

$405,902

3

    Complete
Robertson
Elementary
Replace VCT in classrooms and hallways

$99,127

1

Complete
Robertson
Elementary
Roof replacement

$1,652,713

1

Complete
Robertson
Elementary
Add parking lot lighting

$96,439

1

      Complete
Robertson

Elementary

Art room renovation and kiln room addition

$81,013

3

 

                            Substantially Complete

Robertson
Elementary
Improve water drainage around building

$128,076

3

Robertson
Elementary
Install ventilation in faculty restrooms

$24,812

2

Complete
Spicewood
Elementary
Replace portables $917,485 1 Complete
Spicewood
Elementary
Sidewalk to Tin Cup Avenue

$10,604

2

Complete
Voigt
Elementary
Replace split systems/upgrade gym units/HVAC

$801,943

1

Complete
Voigt
Elementary
Expand gymnasium

$857,056

3

                Substantially Complete
Voigt
Elementary
Repair sidewalks near the portables

$19,715

2

     Complete
Wells
Branch Elementary
Partial library renovation

$168,524

3

Complete
Wells
Branch Elementary
Replace blacktop/concrete area

$102,381

1

Complete
Wells
Branch Elementary
Replace fire alarm system

$316,134

1

Complete
Wells
Branch Elementary
Replace with ADA playscape (has no
ADA equipment)

$122,035

2

Complete

$55,450,045

CAMPUS

PROJECT

BUDGET

SALE

COMPLETE

C.D.
Fulkes Middle School
Creation of a comprehensive master plan

$69,000

1

Complete
C.D.
Fulkes Middle School
Phase 1 master plan

$8,431,039

2

Canyon
Vista Middle School
Replace
existing PA/Clock/Bell systems

$311,264

1

Complete
Canyon
Vista Middle School
Replace main sewer line

$506,635

1

   Complete
Canyon
Vista Middle School
Replace existing grease trap

$243,125

3

Canyon
Vista Middle School
Roof replacement and exterior wall sealing

$3,253,239

3

Cedar
Valley Middle School
Dance studio portable       $115,886     1  

Complete

Cedar
Valley Middle School
Replace running track

$750,000

1

 Complete
Cedar
Valley Middle School
Replace fire alarm system

$585,565

1

Complete
Chisholm
Trail Middle School
Kitchen area addition and remodel

$1,595,753

3

Chisholm
Trail Middle School
Replace existing PA/Clock/Bell systems

$311,263

1

Complete
Chisholm
Trail Middle School
Roof replacement

$2,822,383

3

Complete
Deerpark Middle School Roof replacement

$3,143,828

1

Complete
Deerpark Middle School Half gymnasium addition

$2,785,006

3

Grisham
Middle School
Dance studio portable

$115,886

1

Complete
Grisham
Middle School
Replace existing PA/Clock/Bell systems

$311,263

1

Complete
Hopewell
Middle School
Half gymnasium addition

$2,672,218

3

Pearson Ranch
Middle School
Design and miscellaneous fees/permits

$3,000,000

1

Complete
Pearson Ranch
Middle School
Construction of new middle school

$46,833,032

1

Complete
Ridgeview
Middle School
Replace VCT in fine arts corridor

$95,575

1

Complete
Walsh
Middle School
Dance studio portable

$115,886

1

Complete

$78,067,846

CAMPUS

PROJECT

BUDGET

SALE

COMPLETE

Cedar
Ridge High School
High School #1 auditorium

$19,450,000

1

Substantially Complete
Cedar
Ridge High School
Install parking lot light poles

$140,274

1

Complete
McNeil
High School
Creation of a comprehensive master plan

$69,000

1

Complete
McNeil
High School
Phase 1 master plan (includes ag
science)

$13,000,000

1

McNeil
High School
Phase 1 master plan 

$15,000,000

2

Round
Rock High School
Phase 3B master plan (third classroom wing)

$13,681,872

1

Substantially Complete
Stony
Point High School
Ag science phase 2

$1,539,648

1

 Complete
Stony
Point High School
High School #2 auditorium

$19,450,000

3

Westwood
High School
Phase 3 additions and renovations/master plan

$25,424,137

1

Substantially Complete

$107,754,931

 

 

CAMPUS

PROJECT

BUDGET

SALE

COMPLETE

District Band instruments

$942,000

1

District Hazmat abatement (summer 2015)

$156,000

1

District Hazmat abatement (summer 2016)

$150,000

2

District Hazmat abatement (summer 2017)

$80,000

3

District New buses

$5,296,990

1

District Portable restroom & carpet (summer 2015)

$223,560

1

 Complete
District Portable restroom & carpet (summer 2016)

$200,000

2

District Portable restroom and carpet (summer 2017)

$247,120

3

District Rebuild ponds (2014 bond sale)

$140,000

1

District Rebuild ponds (2015 bond sale)

$204,750

2

District Rebuild ponds (2016 bond sale)

$250,507

3

District Reroof portables (summer 2015)

$260,066

1

District Reroof portables (summer 2016)

$260,066

2

District Reroof portables (summer 2017)

$260,064

3

District Tech (includes video surveilance)
14/15

$2,800,000

1

District Tech (includes video surveilance)
15/16

$16,532,189

1

District Tech (includes video surveilance)
16/17

$15,598,690

2

District Tech (includes video surveilance)
16/17

$14,125,176

3

$57,727,178

2014 Bond Update — As of January 2016

Elementary School

  • Anderson Mill – Carpet replaced schoolwide.
  • Berkman – Portable classroom flooring replaced.
  • Bluebonnet – Portable roofing replaced.
  • Caldwell Heights – Flooring in cafeteria and outside restroom replaced.
  • Cactus Ranch – Portable classrooms flooring replaced.
  • Caraway – PA, Clock, Bell systems replaced.
  • Deep Wood – Playground equipment replaced, Substantial completion of HVAC units and electric upgrades, and Partial roof replacement.
  • Double File Trail – Partial roof replacement.
  • Fern Bluff – PA, Clock, Bell systems replaced, and
    Portable roofing replaced.
  • Forest North – Playground equipment replaced, Replaced alarm systems, and Portable classroom flooring replaced.
  • Gattis – Replaced alarm systems.
  • Great Oaks – Replaced alarm systems.
  • Live Oak – Portable classroom flooring replaced.
  • Pond Springs – Portable roofing replaced.
  • Robertson – Flooring in classroom and hallways replaced,Install ventilation in faculty restrooms, Roof replacement, and Portable roofing replaced.
  • Spicewood – Portables replaced by classroom module, and Sidewalk to Tin Cup Avenue constructed.
  • Sommer – Portable classroom flooring replaced.
  • Voigt – Air conditioning systems replaced, Gym upgraded, and Portable roofing replaced.

Middle School

  • Canyon Vista – PA, clock, bell systems replaced.
  • C.D. Fulkes – Comprehensive master plan created.
  • Cedar Valley – Running track replacement, and
    New dance portable.
  • Deerpark – Roof replaced.
  • Grisham – New dance portable installed.
  • Walsh – New dance portable installed.
  • Ridgeview – Portable roofing replaced.

High School

  • McNeil – Comprehensive master plan created.
  • Stony Point – Phase 2 of agriculture science facility construction completed.

District-wide

  • Portable restrooms and carpet replaced.